Client: FDOT District 2
Columbia County, FL

Eisman & Russo

Project Description:

Eisman & Russo, Inc. provided civil engineering for the highway construction plans for I-75/SR 93 from Alachua County to the SR 47 Interchange. The project consisted of milling and resurfacing and cross-slope adjustment of outside lanes from 2% to 3%. Design activities included pavement design cross sections, typical sections, plans, signing and pavement markings and maintenance of traffic plans. In addition, rest area ramp realignment and SR 25 exit ramps realignment super elevation corrections were completed. The first section of this project was approximately 9.8 miles and the second section was approximately 5.1 miles.

Services Provided:

Roadway Design
Drainage Design
Utility Design & Permitting
Constructability Review
QA/QC

Performance Dates:

2006 – 2008

Construction Cost:

$28 million

 
 
 
 