WHERE COMMITMENT AND ACTION MEET

Client: FDOT District 2
Duval County, Florida

Eisman Russo

Project Description:

Eisman & Russo, Inc. performed Construction Engineering & Inspection services for the Design-Build Operational Improvements of the I-95/I-10 Interchange and Fuller Warren Bridge. The improvements to the existing I-95/I-10 Interchange included widening the Fuller Warren Bridge to create three extra lanes of traffic along I-95 as well as a shared-use path adjacent to the bridge.  The bridges included drilled shaft foundations, piling, micropiles, footers, columns, and caps. The project included roadway reconstruction and widening of the I-95 and I-10 Interchange, ramp construction and widening, concrete & asphalt paving, construction of noise walls, ITS, signalization, signing, pavement markings and landscape relocation. Included in this work were improvements to local side streets with aesthetic features as agreed with area community stakeholders, businesses, and residents.

The project received the 2023 Florida Transportation Builders Association (FTBA) Best in Construction Award – Major Bridge.

Services Provided:

Construction Management & CEI
Construction Administration
Cost Estimation & Management
QA/QC Plans
Planning & Scheduling
Design-Build

Performance Dates:

March 2017 to June 2023

Construction Cost:

$200 million

Eisman & Russo, Inc.
Consulting Engineers

6455 Powers Avenue
Jacksonville, Florida 32217
Telephone: (904) 733-1478
Fax: (904) 636-8828

Eisman & Russo

Copyright © 2024 • All Rights Reserved
 Designed by Ocean Web Design