Client: FDOT District 6
Miami-Dade County, Florida

SR8262

Project Description:

This Design-Build project includes the widening along both SR 826 and SR 836, the construction of a four-level interchange as well as the reconstruction modifications of the Flagler Street/SR 826 and the Milam Dairy Road/NW 72nd Avenue/SR 836 interchanges. The project includes the construction of 46 bridges within the interchange and will provide motorists direct access to their designated exit without using the expressway. The roadways for both the SR 826 and SR 836 are being realigned and completely reconstructed. Along with the alignment changes, the grades for the roadways are also changed. The project includes extensive use of MSE walls for the embankments, and pavement designs incorporate Superpave asphalt with lime rock base throughout the project. Of the 46 bridges built as part of the interchange construction, 38 are standard simple span bridges for grade crossings, railroad and ramp crossings and a lake crossing.

This project is the final and largest section of the 12-part Palmetto Expressway Improvement Program which consists of major construction along a 16-mile corridor. The SR 826 and SR 836 Interchange, used by over 400,000 motorists daily, is being reconstructed to enhance safety and reduce congestion for motorists using the Interchange.

Services Provided:

Construction Management
Construction Engineering & Inspection
Design-Build Project

Performance Dates:

2010 – 2016

Construction Cost:

$589 million

 
 
 
 

 Copyright © 2017 • Eisman & Russo - Consulting Engineers • All Rights Reserved
 Designed by Ocean Web Design