Client: FDOT District 1
Collier County, FL

 Eisman & Russo

Project Description:

Eisman & Russo, Inc. provided CEI services for this Design-Build project which included widening 3.9 miles of US 41 from a two-lane facility to six 12’ lanes with 5’ paved shoulders, open swales, a 10’ paved shared use pedestrian/bicycle path and a 5’ concrete sidewalk. Project also included approximately 5000 feet of pre-cast sound walls on auger cast piles, nearly 3 miles of concrete gravity walls, replacing one 107’ simple 3-span concrete bridge and three cast-in-place concrete box culverts, as well as the replacement of one traffic signal including mast arms and drilled shafts and all associated signing and striping. This project also involved 12 separate utility owners each of which had extensive relocation efforts, especially water main and force main installation which were included in a separate $5M JPA with Collier County.

Services Provided:

Construction Management
Construction Engineering & Inspection
Design-Build

Performance Dates:

October 2013 – December 2015

Construction Cost:

$37.9 Million

 
 
 
 

 Copyright © 2017 • Eisman & Russo - Consulting Engineers • All Rights Reserved
 Designed by Ocean Web Design