Client: FDOT District 5
Brevard County, FL

ellisroad

Project Description:

Group 168 includes three projects the first of which is the Ellis Road Interchange is a new interchange and roadway project beginning .6 miles west of I-95 and connecting the interchange to Ellis Road at John Rodes Boulevard on the east side and St. Johns Heritage Pkwy/US192 on the west side. Construction consists of two new bridges (Bridge #700239 and #700240), 168 piles, 4 ramps, MSE walls, 2 new box culverts (CD-02 and Bridge #704198), 4 travel lanes, 5 ponds and canal rerouting. The project will provide a direct access between I-95 and Melbourne International Airport. The second project, SR50, is a 5-mile milling & resurfacing project with overbuild, shoulder widening, asphalt repair, guardrail replacement and repair, minor drainage work, signal/ITS improvements, replacing bridge expansion joint and new pavement markings. The final project is the Brevard County Pedestrian Lighting Bundle B project which will include 4 new poles, 2 foundation removals, 3 luminaire and arm replacements, 10 LED retrofits and one load center relocation.

Services Provided:

Construction Management
Construction Engineering & Inspection

Performance Dates:

10/2018 to Present

Construction Cost:

$44.5 million

 
 
 
 

 Copyright © 2019 • Eisman & Russo - Consulting Engineers • All Rights Reserved
 Designed by Ocean Web Design