Client: Broward County Board of County Commissioners
Broward County, FL
Project Description:
Eisman & Russo provided CEI Services for this reconstruction and widening project of 0.86 miles of Wiles Road. The project included adding a lane in each direction with bike lanes, curb & gutter and sidewalks on both sides. The existing lanes were milled, over-built and resurfaced with two inches of structural course and one inch of friction course of asphalt. In addition, the project included a new storm water system with French drains, new cross drains, interconnecting pipes ranging 18 inch to 36 inch in diameter, new outfalls, addition of L-Walls, two intersection signalization upgrades at Riverside Drive and Leitner Drive West/Woodside Drive to replace the existing strain pole signals with mast arms, signing & pavement marking to current specifications, installation of new lighting and the relocation and/or removal of existing trees along North side, South side and Median to give way to new landscaping and a new irrigation system in the median.
Services Provided:
Construction Management
Construction Engineering & Inspection
Performance Dates:
5/2018 to 8/2020
Construction Cost:
$7.6 million