Client: FDOT District 1
Polk County, FL

Project Description:

Eisman & Russo is currently providing CEI services for this 2.4 mile project to reconstruct to a 3-lane urban section with new curb & gutter, closed drainage, sidewalks and bike lanes. The eastern and western ends are to be widened with black base and the existing roadway milled & resurfaced with cross slope correction. The midsection (1.3 mile) is to be reconstructed, widened, realigned and grade raised. The project includes a UWHCA with the City of Winter Haven to install new, remove existing water and sewer lines utilizing significant directional drilling. The corridor is heavily traveled by vehicle, pedestrian and bicyclist in a constrained right-of-way with many businesses, medical facilities, schools, and residences.

Services Provided:

Construction Management
Construction Engineering & Inspection

Performance Dates:

10/2018 to Present

Construction Cost:

$24.9 million

 
 
 
 

 Copyright © 2019 • Eisman & Russo - Consulting Engineers • All Rights Reserved
 Designed by Ocean Web Design